Posts Tagged ‘Denver Welding’

An interesting project has come to our shop that is leading to a new welding procedure. The project is a simple stainless steel pressure vessel, 6” diameter pipe, 0.432” wall approximately 18” long. While this seems overly simple it has led me to investigate the welding options we have qualified for stainless in our shop. We have stainless hardwire, flux core, stick, and TIG procedures but which one to use? Flux core fills very fast, hardwire is clean and neat, TIG has an artistic look when done right but is slower then hardwire and flux core. Stick welding is smoky and unless the welder is REALLY good it just doesn’t look as nice as the others. I’m beginning to think multiple processes. If we hardwire the root then no backing gas is required (meaning we don’t have to purge the inside of the vessel to remove any oxygen exposure on the back side of the weld) then we can fill the majority of the weld joint with either spray arc hardwire or flux core and finish with TIG. We get a solid, quick welded joint that looks like art! But I don’t have a weld procedure that includes three different welding processes. Do I need to break out some stainless steel scrap and weld up a coupon using the three selected processes and have it tested? Conveniently, I do not. Because I have Procedure Qualification Reports (PQR’s) for all three processes I can write a new procedure using the existing PQR’s. I can take the information from each PQR and implement a new procedure that includes all three processes. Each process must be noted on the new weld procedure and the essential variables must also be noted. One other item to be sure to review, the thickness of the additive PQR’s must yield the thickness range required for the intended joint. Maintaining documentation of all our welding processes and procedures makes this an easy accomplishment, an accomplishment that allows us to utilize our knowledge and history to go forward. If you like the way a certain welding process looks but have been told it costs too much or takes too much time, give us a call. We’ll help you find a happy medium that yields beautiful welding and cost effectiveness.

TIG Cover Pass

Read Full Post »

Since 1980 Precision has built its business by designing and building gas processing plants, chemical and processing plant components, and skid packaged equipment including, tanks, HRSG, boilers, re-boilers, compressors, separators, heat exchangers, filtration systems, dehydration, and dew point control for natural gas processing facilities. Precision has also built several catalytic reactors for specialized applications, slug catchers, pulsation bottles, scrubbers, oxygen service vessels, flow meters, gas valve trains, accumulators, and complete skid packages.

Precision provides it’s customers with consulting, design, engineering, and ASME calculations. Precision can also provide in shop and mobile ASME vessel repairs and rerates, hydro testing, machining, welding (including ASME “R” stamped repairs, inspection services including borescope video inspection.

Most importantly, Precision is commercially distinguished as a business that offers it’s clients much more than a typical fabrication and welding shop.  Precision has built a reputation and is known to provide resources and knowhow for sustainable advantages in technology and project development. Precision uses it’s decades of experience and knowhow to offer value added solutions to our clients projects and fabrication needs.  This often saves time and money on projects and prototyping that bring long term value to our clients.

ImageIn 2013, Precision will continue our 33 year history building processing plants and equipment with a focus on natural gas processing. The biggest difference is our new, state of the art, 40,000 Square foot fabrication facilities. If you have a project and you need an experienced, knowledgable, and well qualified manufacturer please allow us the privilege to provide your company with a competitive quote.

Read Full Post »

Everything seemed to be going so well, when all of the sudden we find ourselves thrown under the bus by another team member!  Working on a project with a team of people from different departments, companies, or disciplines it is inevitable someone is going to be thrown under the bus.  It is almost comical to me because I have found myself under the bus many times. I have been thrown under the bus by people I brought on to the job who are protecting their own interest (AKA covering their own butt).  I have been thrown under the bus because I am nice, because I was late or not at the meeting, because I was doing too good of a job, and  I have been thrown under the bus because I was the problem.  In any event it seems inevitable that doing projects with big budgets and tight deadlines people will be thrown under the bus for all sorts of good and not so good reasons.There are some people that are particularly good at throwing co-workers under the bus.  Usually these expert “bus chuckers” are gifted at gab but lack the skill sets that would make them proficient at the task at hand.  The boss likes them because they talk a big talk, are bold in their actions, and kiss up like it’s an olympic sport and they are the reigning world champion.

I like to instill in my employees a different way of conducting business and completing projects.  What you lack in perfection you must make up for in integrity.  This means that personal responsibility must come  first and foremost over the blame game.  The hope is that when an employee makes a mistake they don’t wait for everything to unravel and for panic to ensue.  This is a paradigm that allows for mistakes and mishaps but requires everyone to throw themselves under the bus when the time comes.  This mindset allows for the “human factor” to be real in our company without the need to malign others because of an inevitable error.

This approach has the benefit to us as a company as well as for our clients.  In the world of process equipment, pressure vessels and other custom fabricated products we are always striving to improve cost competitive, time tables, a quality of goods.  While we allow for “new development” we have to also allow for a mistake because sometimes things don’t go as planned.  The errors can make for cost over runs, late delivery, re-work, and all the other complications you hate to see in a project.  Again, some would see this as an opportunity to throw their own client under the bus and try to recover some of the lost profits.  However, I see this approach as a risk reward business strategy that has given Precision Pipe great advantages over our competition in fabrication and assembly techniques. We would never pass along a cost to a client based on our own errors.  In fact once Precision paid more than 100% the cost of a tank because of our own trial and error.  Precision fronted and benefited from 100% of the error and our client was never the wiser as we still delivered in their eyes on time and on budget.

Denver Stainless Steel Welding

Exceeding expectations and standards

Calling a foul or a penalty on yourself is a humbling experience.  You can face the wrath of your customers, co-workers, management, money managers (they seem to be the least risk diverse as a constant in the universe) or even yourself.  However, if you can be transparent the dividends pay in happy customers, good products, leaner fabrication, and better schedules, and good reputation is well worth being labeled as imperfect in execution, but superior by integrity.

http://www.Precision-Pipe.com

Read Full Post »

An interesting project has come to our shop that is leading to a new welding procedure. The project is a simple stainless steel pressure vessel, 6” diameter pipe, 0.432” wall approximately 18” long. While this seems overly simple it has led me to investigate the welding options we have qualified for stainless in our shop. We have stainless hardwire, flux core, stick, and TIG procedures but which one to use? Flux core fills very fast, hardwire is clean and neat, TIG has an artistic look when done right but is slower then hardwire and flux core. Stick welding is smoky and unless the welder is REALLY good it just doesn’t look as nice as the others. I’m beginning to think multiple processes. If we hardwire the root then no backing gas is required (meaning we don’t have to purge the inside of the vessel to remove any oxygen exposure on the back side of the weld) then we can fill the majority of the weld joint with either spray arc hardwire or flux core and finish with TIG. We get a solid, quick welded joint that looks like art! But I don’t have a weld procedure that includes three different welding processes. Do I need to break out some stainless steel scrap and weld up a coupon using the three selected processes and have it tested? Conveniently, I do not. Because I have Procedure Qualification Reports (PQR’s) for all three processes I can write a new procedure using the existing PQR’s. I can take the information from each PQR and implement a new procedure that includes all three processes. Each process must be noted on the new weld procedure and the essential variables must also be noted. One other item to be sure to review, the thickness of the additive PQR’s must yield the thickness range required for the intended joint. Maintaining documentation of all our welding processes and procedures makes this an easy accomplishment, an accomplishment that allows us to utilize our knowledge and history to go forward. If you like the way a certain welding process looks but have been told it costs too much or takes too much time, give us a call. We’ll help you find a happy medium that yields beautiful welding and cost effectiveness.

Denver Stainless Steel Welding

TIG Cover Pass

Read Full Post »

I once had a friend that ask me how I could possibly make a living by making pressure vessels, implying there can’t be any demand for such products.  From an outsiders view he didn’t really know what a pressure vessel was or what it really did. I was amused by his comment because I knowingly realize that Pressure Vessel’s certainly lack any kind understanding by the general public, but the need, and application for pressure vessels is certainly in high demand.  I imagine most people must think this is really a quirky business but don’t really know what pressure vessels are, what they are used for, and how their application is important to our daily lives.  As long as there is a need for petroleum products, natural gas, heat, and cooling there are a network of pressure vessels that are necessary to keep our infrastructure safe and operational.  Likewise, pressure vessels are used in cosmetics, pharmaceuticals, breweries (yeah beer), food processing, water treatment, and countless other applications that enhance our daily lives. In fact, any component, piping, or tank that is designed to hold 15 psi or more is subject the guidelines and compliance of the ASME code for boilers and pressure vessels.

The American Society of Mechanical Engineers (ASME) has set the standards for pressure vessel design and manufacturing that has enabled our country’s infrastructure to become a complex and vast network.  While this is nothing short of a modern marvel it is truly remarkable how the ASME guidelines have kept workers and the public safe from the explosive high pressure gases.  In fact, the ASME standards have proven to be completely effective as long as the code is followed by everyone who has ASME certified components.

Likewise, it is scary to hear about explosions, fires, and other catastrophic events in the oil and gas industry as well as commercial boilers.  These failures almost always occur when an operator of the equipment is either too lazy to follow code or is ignorant about the effects of not following ASME guidelines.  Recently, I heard about a repair on a Government owned and operated boiler (in an ASME compliant state) that had overlooked using an ASME qualified shop for more than an decade.  This repair required an “S” stamp to perform the work, but upon inspection there had been no less than ten previous repairs performed by a non-qualified company.  This was alarming for a few reasons.  First, the state was failing to oblige by their own guidelines.  This was a public hazard and a huge liability for the State, the licensed boiler operator, and for the welder who did the repairs.  It is imperative to any repair on an ASME component (boiler, pressure vessel, heat exchanger)  that such repairs are performed by a certified welder by a qualified shop.  In other words, the company performing such repairs, at a minimum, must have a National Board “R” stamp in good standing.  Further, the repairs must be performed in compliance of the applicable code as designated by the ASME and NBIC code guidelines.  It is alarming to see States that designate compliance to code construction fail to recognize the necessary steps to keep their own equipment in compliance.

What does this mean to the average person? Not much to be truthful. However, to anyone that has process equipment it is absolutely imperative to recognize the importance code compliance has on the safety of those aruond us.

The ASME helps the global engineering community develop solutions to real world challenges. Founded in 1880 as the American Society of Mechanical Engineers, ASME is a not-for-profit professional organization that enables collaboration, knowledge sharing and skill development across all engineering disciplines, while promoting the vital role of the engineer in society. ASME codes and standards, publications, conferences, continuing education and professional development programs provide a foundation for advancing technical knowledge and a safer world.

Therefore, the next time you fire up your gas grill (you can verify your propane tank is ASME / NBIC certified) remember that countless hours of engineering, design, review, materials and code compliance, nondestructive testing, and third party inspection have gone into keeping you and your loved ones safe, even if you don’t know what a pressure vessel is.

http://www.Precision-Pipe.com

Read Full Post »

It wasn’t too long ago that I walked onto a refinery job site that Precision Pipe was supply equipment to.  At this site I saw an interesting event about to transpire.  A welder who was not associated with our company was getting ready to light a torch next to a vessel we had just delivered the day before. It appeared to me that he intended to cut into the vessel. Surprised to be seeing this, I quickly made my way over to him to see what he was doing.  He informed me that the construction manager (from a well respected and large engineering firm) instructed him to make a modification to the pressure vessel as a solution to a piping problem.  I asked him to stand by for a second so that we could discuss with plant manger the implications his modifications might have.

The welder became rather irritated with me and informed me he had his directions and he intended to follow them.  For those of you that are unfamiliar with the ASME code, let me explain the implications of this kind of modification in the ASME code world. First, if the welder had actually brought his torch to the shell of the vessel he would have undone the ASME certification on that vessel.  In other words the vessel would have no longer been a certified ASME pressure vessel and the customer would have wasted several thousands of dollars on that pressure vessel.  As the manufacturer I would have been required to remove the name plate from that vessel the moment I saw the flame come into contact with it. Second, that vessel would have no longer been acceptable to use on the job site as it was being implemented at a refinery in an ASME mandatory site and State.  Lastly, Precision would have likely had to of retaken possession of that vessel, repair it according to ASME standards, re-certify and qualify the vessel as meeting the ASME code.  The vessel would have also required a second name plate identifying it as an “R” or “Repaired” pressure vessel.

The reality of the situation was, the construction manager was under immense pressure to complete the project and at that point he was willing to cut corners.  What he didn’t anticipate was getting caught in a major blunder which would have added greater delays and expense to his project.  Anything worth doing is worth doing right and this is especially true for engineered products like ASME vessels. Knowing what the proper proceeders are for welding and modifying an ASME pressure vessel is imperative.  In this situation, the only way to modify the vessel is following the ASME code by using a qualified ASME shop with an “R” stamp.  Any welding or cutting on an ASME pressure vessel must be performed by a qualified shop that is in good standing with the National Board.  The pressure vessel will have to be reinspected by a third party authorized inspector and may need to have X-ray and hydrostatic testing to keep the ASME certification and name plate.

As an ASME qualified shop we encourage anyone to use us or another code shop as a resource to answer any question you may have on qualifications, modifications, and inspection of ASME pressure vessels, Heat Exchanger, or Boiler’s.  We would rather take a few minutes to understand and explain what your options are according to the code then risk an accident or injury .  In addition, if we can simply answer your question this a a free service we offer to any prospective customer.  If you are a plant manager and you are unsure if you can use any certified welder?  Give us a call and we can walk you though what it takes to maintain your ASME certifications.  If you have an ASME pressure vessel, Heat Exchanger, or Boiler that needs work or an addition of a nozzle or coupling.  Call us we can tell you what you must do to add the new components in a safe and code qualified manner.

As it turns out I was able to get the welder to wait a minute.  Explaining to him the consequences of his modification calmed him down long enough to bring in the decision makers.  The plant manager, the construction manager (having tucked his tail between his legs), and I all discussed the changes that were necessary and it was ultimately decided a ‘T’ in the process piping was the most effective work around for the problem.  Having an ASME specialist onsite that day saved thousands of dollars, countless hours, and potentially the integrity of the plants operational safety in the future.  Don’t be shy to email or call us or any other ASME qualified shop to discuss your project or equipment with ASME name plates. Your local rig welder or fabrication shop may be good, they may be able, they may even have a piece of paper that  say’s they are certified to make a weld. However, it is imperative you at least speak with a shop that is ASME qualified before you make any welds on a certified ASME pressure vessel.

http://www.Precision-Pipe.com

Read Full Post »

Driving into work today, I was intentionally cut off by a truck with a trailer attached.  As I was running into the shoulder of the highway and figuring out what kind of “Bo Duke“ move I was going to make, I was able to get a good look at company name on the side of the truck.  It was a company that our business has used in the past and will think twice about using in the future.

The difference between future business and closing your business could be a simple as courteous driving.

Recently a salesperson came in selling uniforms.  I politely told him that we already have a vendor that we are pleased with, but in a few months I will be evaluating the service and obtaining quotes.  He told me a little about his company and their values and we exchanged business cards.  I chuckled at the difference between our company cards.  My company has square cards, his company cards are circular.  As we chatted each other’s cards up – I made the suggestion that his card would be better served as a coaster…a few weeks later, I received a card in the mail with a coaster enclosed.

Effort creates opportunity.

What I love about working for Precision is that hustle, courtesy, and going the extra-mile is second nature to us.  We are always looking for ways to save our customers money, improve lead-time, and deliver an excellent product.  If you haven’t had a chance to work with us, give us a call.  We would love the opportunity to partner with you.

Read Full Post »